Lingkup Instalasi Elektrikal Power Plant
Pembangkit listrik memerlukan instalasi elektrikal presisi tinggi, mulai dari sisi generator, trafo unit, switchgear, hingga relay proteksi diferensial dan excitation system.
Lingkup Pekerjaan:
- Instalasi generator (stator, rotor, exciter)
- Pemasangan trafo unit (generator transformer)
- Instalasi switchgear 150kV (GIS atau AIS)
- Panel relay proteksi generator (87G, 64F, 40Q)
- Instalasi sistem eksitasi (excitation system)
- Bus duct dan kabel daya 11kV/6.6kV generator
- Sistem auxiliary power (station service transformer)
- Battery dan battery charger DC system 110V
- Instalasi SCADA dan control panel DCS
- Cable tray, grounding, dan lightning protection
Standar yang Diterapkan:
IEC 60034 (Generator)IEC 60076 (Trafo)IEEE C37 (Switchgear)IEC 61850 (SCADA)IEC 61511 (SIS)PLN SPLN D3.001
Klien/Proyek yang Dilayani:
- PLTU captive power smelter (IMIP, IWIP, VIRTUE DRAGON)
- PLTU IPP (Independent Power Producer)
- PLTM dan PLTA (hidro minihydro)
- PLTS (photovoltaic utility scale)
- PLN pembangkit Indonesia Timur
Tahapan Pelaksanaan Pekerjaan Instalasi
1
Single Line Diagram & Protection Philosophy Review
Review SLD, relay coordination study, seting relay proteksi generator dan trafo
2
Material Inspection (FAT)
Factory Acceptance Test generator, trafo, switchgear sebelum mobilisasi ke site
3
Civil Work Coordination
Koordinasi pondasi generator, trafo yard, dan cable trench dengan kontraktor sipil
4
Mechanical & Electrical Installation
Erection dan setting generator stator/rotor, instalasi trafo unit, switchgear
5
Bus Duct & High Voltage Cabling
Instalasi bus duct generator, kabel HV 11kV/6.6kV, cable termination
6
Relay & Control Panel Wiring
Wiring panel relay proteksi, DCS, SCADA, system control and protection
7
Pre-commissioning Test
Megger, TTR trafo, winding resistance, CB timing, excitation test (no-load)
8
Commissioning (Load Test)
Load bank test generator, paralleling test, full load test 100%
9
COD (Commercial Operation Date)
Witnessing PLN/owner, issuance COD certificate, serah terima aset
Referensi Proyek Instalasi PT TEM
PLTU Suralaya 9-10 (Banten)
Testing generator dan trafo daya pembangkit 660MW
PLTU Captive Smelter Morowali
Instalasi dan commissioning generator captive power smelter nikel
PLTU Captive Halmahera (IWIP)
T&C sistem elektrikal pembangkit IWIP Weda Bay
PLTM/PLTA Kalimantan
Commissioning generator minihydro remote area
PLTB/PLTS Energi Terbarukan
Testing dan commissioning inverter grid-tie EBT
PLTGU IPP Jawa
Commissioning switchgear 150kV dan relay proteksi
Dukungan Testing & Commissioning Setelah Instalasi
PT TEM adalah satu-satunya kontraktor EI di Indonesia Timur yang menyediakan layanan full-package: dari instalasi hingga testing & commissioning. Setelah instalasi selesai, tim T&C kami langsung melakukan pengujian dengan alat milik sendiri — tidak perlu mobilisasi kontraktor lain.
Butuh Kontraktor Instalasi Elektrikal yang Terpercaya?
PT TEM: Satu paket — supply material, instalasi, testing, commissioning, laporan resmi. Dari Balikpapan ke seluruh Indonesia.