Jasa Load Bank Testing & Rental Load Bank — Seluruh Indonesia
PT TEM menyediakan jasa load bank testing dan rental load bank 500kW–5MW untuk genset, PLTU, UPS, data center, dan ESS baterai. Own fleet — bukan sewa dari pihak lain.
⚡ Load Bank Testing Genset
- FAT (Factory Acceptance Test) genset baru
- SAT (Site Acceptance Test) setelah instalasi
- Commissioning test kapasitas penuh 100% load
- Step load test 25%→50%→75%→100%
- Voltage regulasi dan frequency stability test
🏭 Load Bank PLTU & Pembangkit
- Pre-commissioning test auxiliary power PLTU
- Black start test dan island mode test
- Load rejection test turbine generator
- Grid synchronization test sebelum COD
- Performance test after major overhaul
🖥️ Load Bank Data Center & UPS
- UPS load test full capacity sebelum GO LIVE
- Critical power commissioning data center Tier III/IV
- Battery discharge test dan capacity verification
- Transfer switch test (ATS/STS) dengan beban nyata
- ESS (Battery Energy Storage) capacity test
🛢️ Load Bank Industri Migas & Mining
- Load test genset platform offshore
- Emergency generator test fasilitas kilang
- Load bank test captive power smelter
- Commissioning diesel generator remote area
- Sertifikasi genset sebelum audit SIL/HAZOP
Harga Rental Load Bank PT TEM — By Actual (Transparan)
| Kapasitas | Tegangan | Tipe | Harga | Delivery Kalimantan |
|---|---|---|---|---|
| Load Bank 500 kW | 400V / 690V | Resistive | By Actual | ✅ 24 jam |
| Load Bank 1 MW | 400V / 6,6kV | Resistive | By Actual | ✅ 24 jam |
| Load Bank 2 MW | 6,6kV / 11kV | Resistive | By Actual | ✅ 48 jam |
| Load Bank 5 MW | 11kV / 20kV | Resistive | By Actual | ✅ By arrange |
*Harga “by actual” = tergantung lokasi, durasi, mobilisasi. Minta penawaran resmi (SPH) dalam 2 jam kerja
Delivery Kalimantan
Bukan sewa pihak lain
Load bank + T&C 1 vendor
Jasa Load Bank Testing & Rental per Wilayah Indonesia
🟢 Kalimantan (Base)
Balikpapan, Samarinda, Bontang LNG, Sangatta (batu bara), IKN Nusantara — delivery 24 jam
🟡 Sulawesi
Makassar, Morowali IMIP (captive power 3GW), Palu, Kendari — 1–2 hari
🟡 Papua
Timika (PTFI genset), Sorong, Jayapura, Manokwari — 2–3 hari
🟡 Sumatera
Dumai (kilang Pertamina), Pekanbaru, Medan, Palembang — 2–3 hari
🟡 Maluku & NTT
Halmahera IWIP, Ternate, Ambon, Kupang — by arrangement
🟡 Jawa & Bali
Data center Jakarta, PLTU Jawa, industri Cilegon, Surabaya — koordinasi
Keywords: jasa load bank testing Indonesia, rental load bank Kalimantan, sewa load bank PLTU, load bank test data center, load bank testing genset commissioning, rental load bank Balikpapan Samarinda Bontang