Home » Jasa Testing Commissioning HV & Electrical System Indonesia | PT Tridaya Elektra Mandiri

Jasa Testing Commissioning HV & Electrical System Indonesia | PT Tridaya Elektra Mandiri

Spesialis Testing & Commissioning HV/MV/LV

Jasa Testing & Commissioning
High Voltage Sistem Elektrikal Industri

PT Tridaya Elektra Mandiri — pengujian komprehensif Gardu Induk 150kV, transformator daya, kabel HV, switchgear MV, dan sistem proteksi. Bersertifikat IEC, SNI, PLN S5. Melayani seluruh Indonesia.

500+
Proyek HV/MV Selesai
150kV
Tegangan Tertinggi
20+
Provinsi Dilayani
IEC
Standar Pengujian
Layanan Testing & Commissioning HV
Pengujian komprehensif sesuai standar IEC 60076, IEC 60694, PLN S5, dan IEEE
GI

Testing Gardu Induk 70kV – 500kV

Commissioning lengkap GI — transformator daya, busbar, isolator, cubicle CB/DS, sistem proteksi relay, SCADA, dan grounding. Pengujian Pre-Commissioning hingga FAT.

SFRADielectricRatio TestIR Test
TX

Testing Transformator Daya

Pengujian trafo distribusi dan daya — Ratio, IR, Dielectric, Winding Resistance, SFRA, Load Test, Dissolved Gas Analysis (DGA), dan Oil Breakdown Voltage (BDV).

DGA/BDVSFRALoad TestOil Analysis
CB

Testing Circuit Breaker & Proteksi

Pengujian CB SF6, Vacuum, dan OCB — contact resistance, timing, travel curve, insulation resistance, dan verifikasi relay proteksi overcurrent, differential, earth fault.

CB TimingRelay TestIDMT67/50/51
HV

Hipot Testing Kabel HV

Pengujian withstand voltage kabel HV/MV — Hipot AC/DC, Very Low Frequency (VLF 0.1Hz), partial discharge locating, TDR, dan OTDR untuk kabel fiber optik kontrol.

VLFPD LocatingHipot ACTDR
LB

Load Bank Testing Generator & UPS

Uji beban Generator diesel, Gas Turbine, dan UPS — kapasitas hingga 2000 kVA. Load Bank 400V AC dan 110V DC. Measurement harmonic, power factor, temperature rise.

400V AC110V DCHarmonic2000kVA
MV

Commissioning Panel MV Switchgear

Commissioning switchgear MV 6kV–20kV — functional test, interlocking, relay setting, insulation test cubicle, dan verifikasi interoperability dengan sistem SCADA.

6kV–20kVGISAISSCADA
Peralatan Pengujian HV Berstandar Internasional
Semua alat ukur dikalibrasi KAN / ISO 17025 — hasil pengujian sah untuk keperluan komisioning PLN, Pertamina, dan klien EPC
SFRA / FRA
Omicron EL CPC 100
Trafo Daya
CPC 100 / CPTD
Omicron
CT/VT Testing
Hipot AC/DC
HV Tester
Kabel HV/MV
Load Bank 400V
TEM Custom
Generator/UPS
Load Bank 110V DC
TEM Custom
Baterai/UPS DC
OTDR
Yokogawa / JDSU
Fiber Optic
Relay Test Set
Omicron CMC
Relay Proteksi
Insulation Tester
Megger / Fluke
IR / Megger
Standar Pengujian yang Kami Gunakan
Setiap pengujian dilakukan sesuai standar internasional dan persyaratan owner/operator

Standar IEC & IEEE

  • ✓ IEC 60076 — Power Transformers Testing
  • ✓ IEC 60694 — Circuit Breaker & HV Switchgear
  • ✓ IEC 60060 — High Voltage Test Techniques
  • ✓ IEC 62271 — High Voltage Switchgear
  • ✓ IEEE Std 43 — Motor & Generator Insulation
  • ✓ IEEE Std 62 — Transformer Dielectric Testing

Standar PLN & Nasional

  • ✓ PLN S5.008 — GI Commissioning Standard
  • ✓ PLN S5.001 — Konstruksi GI 70kV, 150kV, 500kV
  • ✓ SNI 04-0227 — Kabel Tegangan Menengah
  • ✓ PUIL 2011 — Persyaratan Umum Instalasi Listrik
  • ✓ IEC 60364 — Low Voltage Electrical Installations
  • ✓ SPLN D3.011 — Sistem Distribusi 20kV

Deliverables Pengujian

  • ✓ Test Report bertandatangan teknisi bersertifikat
  • ✓ IR Test Record (sebelum & sesudah energize)
  • ✓ Relay Setting Report & Koordinasi Proteksi
  • ✓ Punch List & Deficiency Report
  • ✓ As-Built Documentation (single line, wiring)
  • ✓ Certificate of Commissioning (COC)

Proses Commissioning

  • ✓ 1. Pre-Commissioning Check (visual & mechanical)
  • ✓ 2. Individual Equipment Testing
  • ✓ 3. System Integration Testing
  • ✓ 4. Protection Coordination Verification
  • ✓ 5. Energization & Load Test
  • ✓ 6. Handing Over & As-Built Docs
Melayani Seluruh Wilayah Indonesia
Tim mobile PT TEM dapat bergerak ke lokasi proyek di seluruh nusantara — termasuk remote area dan pulau terluar
Jawa Tengah & Timur
Grid Sistem Jawa
Riau & Kepri
Sumatera
Balikpapan & IKN
Kalimantan Timur
Samarinda & IKN
Kalimantan Timur
Morowali & IMIP
Sulawesi Tengah
Makassar & Sulsel
Sulawesi Selatan
Halmahera & IWIP
Maluku Utara
IKN Nusantara
Kalimantan Timur
Pertanyaan Umum
Berapa lama waktu commissioning untuk Gardu Induk 150kV?
Commissioning GI 150kV baru umumnya 14–21 hari kerja tergantung jumlah bay, kondisi lapangan, dan kelengkapan dokumen. Pre-commissioning bisa dimulai paralel dengan pekerjaan konstruksi di fase akhir untuk mempersingkat jadwal.
Apakah PT TEM menyediakan laporan resmi yang diterima PLN?
Ya. Semua laporan pengujian dibuat sesuai format dan persyaratan PLN, ditandatangani oleh teknisi bersertifikat. Laporan mencakup Test Record, Certificate of Commissioning (COC), dan punch list yang siap untuk hand-over ke PLN.
Apakah bisa melayani proyek di daerah terpencil (remote area)?
Ya. Tim PT TEM terbiasa bekerja di remote area — termasuk site pertambangan Kalimantan, Papua, dan Maluku. Kami mengurus logistik peralatan dan transportasi tim secara mandiri.
Berapa biaya jasa testing dan commissioning?
Biaya bervariasi tergantung scope pekerjaan, lokasi, dan durasi. Untuk mendapatkan penawaran resmi, silakan hubungi kami via WhatsApp dengan informasi: lokasi proyek, scope pengujian, dan timeline. Kami akan merespons dalam 1 jam kerja.

Siap Mulai Proyek Testing & Commissioning?

Konsultasikan kebutuhan pengujian Anda dengan tim ahli PT TEM. Kami berikan penawaran kompetitif dalam 24 jam.

Hubungi Tim Ahli Sekarang