Layanan komisioning lengkap untuk Pembangkit Listrik Tenaga Uap (PLTU) dan PLTGU — dari Unit Auxiliary, Main Generator, Turbine Protection, hingga Grid Synchronization. Berpengalaman di PLTU Suralaya, PLTU Tanjung Jati, PLTU Cirebon, dan puluhan proyek pembangkit lainnya.



Konsultasi Gratis via WhatsApp

2×1000
MW PLTU Suralaya
10+
Proyek PLTU/PLTGU
IEC 60034
Generator Standard
24/7
Mobilisasi Darurat

Lingkup Komisioning PLTU & PLTGU

Layanan lengkap dari pre-commissioning hingga performance test sesuai standar PLN & IEC

Main Generator Commissioning

  • Insulation Resistance Test (IR/PI)
  • High Voltage Test (DC & AC)
  • Resistance Test Stator & Rotor
  • Air Gap Measurement
  • Excitation System Test
  • Grid Synchronization

Turbine Protection System

  • Over-speed Trip Test
  • Vibration Monitoring (Bently Nevada)
  • Bearing Temperature Protection
  • Axial Displacement Test
  • Steam Valve Function Test
  • ETS Logic Verification

Unit Auxiliary System

  • Unit Auxiliary Transformer Test
  • MV Switchgear Commissioning
  • Motor Control Center (MCC)
  • UPS & DC System Test
  • Instrument Air & Service Air
  • Cable Megger & Hi-pot Test

Relay Protection & Control

  • Generator Differential (87G)
  • Over-current & Earth Fault
  • Reverse Power Protection
  • AVR & PSS Setting
  • Synchronizer Test
  • SCADA Integration Test

Coal Handling System

  • Belt Conveyor Drive & Protection
  • Stacker/Reclaimer Control
  • Dust Collection System
  • Crusher Motor Test
  • Weighing Feeder Calibration

BOP & Balance of Plant

  • Circulating Water Pump Test
  • FD/ID Fan & PA Fan Drive
  • Feed Water Pump VFD Test
  • Cooling Tower Fan Control
  • ESP High Voltage Power Supply

Referensi Proyek PLTU Indonesia

Dipercaya oleh kontraktor EPC kelas dunia dan PLN dalam proyek pembangkit strategis nasional

PLTU Tanjung Jati commissioning PT TEM
GI Pedan 500kV commissioning PT TEM
GI Sepatan commissioning PT TEM
PLTGU Riau commissioning PT TEM
ProyekKlien EPCScopeTahun
PLTU Suralaya 2x1000MW Jawa 9&10PT Doosan / Daesun / DonghwaE&I Installation & Commissioning2022-2024
PLTU Tanjung Jati (Batubara)GE GridElectrical Commissioning2022
PLTGU Riau 275MWPT Lotte E&CCable Testing & T&C2021
PLTU CirebonPT Pituin Sukses EnergiTesting & Commissioning2022
BMPP Nusantara 1 (Floating Power Plant)PT MahakamGenerator Commissioning2022
PLTMH GumantiPT Tamaris / PT SastraT&C Electrical2020
GEPP PLTMHPT Barata IndonesiaCommissioning2021

Standar & Metodologi

Semua komisioning dilaksanakan sesuai standar internasional dan persyaratan PLN

IEC 60034

Rotating Electrical Machines – standard pengujian generator dan motor listrik skala besar

IEC 60076

Power Transformers – standard pengujian trafo daya unit auxiliary dan step-up transformer

IEC 61850

Communication Networks untuk digital protection relay di pembangkit modern

IEEE C37

Standard untuk pengujian switchgear dan circuit breaker di sistem pembangkit

SPLN & PLN

Persyaratan teknis PLN untuk komisioning unit pembangkit sebelum sinkronisasi ke jaringan

FAT & SAT

Factory Acceptance Test dan Site Acceptance Test sesuai dokumen kontrak EPC

Siap Komisioning PLTU Anda?

PT Tridaya Elektra Mandiri berpengalaman di PLTU Suralaya 2x1000MW, PLTU Tanjung Jati, PLTGU Riau. Tim engineer kami siap mobilisasi ke seluruh Indonesia.



Hubungi Kami Sekarang

Email: marketing@tridayaelektramandiri.com | 24/7 Emergency Response

💬 Tanya Tim PT TEM Kami siap bantu informasikan:
Scroll to Top