Lingkup Komisioning PLTU & PLTGU
Layanan lengkap dari pre-commissioning hingga performance test sesuai standar PLN & IEC
Main Generator Commissioning
- Insulation Resistance Test (IR/PI)
- High Voltage Test (DC & AC)
- Resistance Test Stator & Rotor
- Air Gap Measurement
- Excitation System Test
- Grid Synchronization
Turbine Protection System
- Over-speed Trip Test
- Vibration Monitoring (Bently Nevada)
- Bearing Temperature Protection
- Axial Displacement Test
- Steam Valve Function Test
- ETS Logic Verification
Unit Auxiliary System
- Unit Auxiliary Transformer Test
- MV Switchgear Commissioning
- Motor Control Center (MCC)
- UPS & DC System Test
- Instrument Air & Service Air
- Cable Megger & Hi-pot Test
Relay Protection & Control
- Generator Differential (87G)
- Over-current & Earth Fault
- Reverse Power Protection
- AVR & PSS Setting
- Synchronizer Test
- SCADA Integration Test
Coal Handling System
- Belt Conveyor Drive & Protection
- Stacker/Reclaimer Control
- Dust Collection System
- Crusher Motor Test
- Weighing Feeder Calibration
BOP & Balance of Plant
- Circulating Water Pump Test
- FD/ID Fan & PA Fan Drive
- Feed Water Pump VFD Test
- Cooling Tower Fan Control
- ESP High Voltage Power Supply
Referensi Proyek PLTU Indonesia
Dipercaya oleh kontraktor EPC kelas dunia dan PLN dalam proyek pembangkit strategis nasional




| Proyek | Klien EPC | Scope | Tahun |
|---|---|---|---|
| PLTU Suralaya 2x1000MW Jawa 9&10 | PT Doosan / Daesun / Donghwa | E&I Installation & Commissioning | 2022-2024 |
| PLTU Tanjung Jati (Batubara) | GE Grid | Electrical Commissioning | 2022 |
| PLTGU Riau 275MW | PT Lotte E&C | Cable Testing & T&C | 2021 |
| PLTU Cirebon | PT Pituin Sukses Energi | Testing & Commissioning | 2022 |
| BMPP Nusantara 1 (Floating Power Plant) | PT Mahakam | Generator Commissioning | 2022 |
| PLTMH Gumanti | PT Tamaris / PT Sastra | T&C Electrical | 2020 |
| GEPP PLTMH | PT Barata Indonesia | Commissioning | 2021 |
Standar & Metodologi
Semua komisioning dilaksanakan sesuai standar internasional dan persyaratan PLN
IEC 60034
Rotating Electrical Machines – standard pengujian generator dan motor listrik skala besar
IEC 60076
Power Transformers – standard pengujian trafo daya unit auxiliary dan step-up transformer
IEC 61850
Communication Networks untuk digital protection relay di pembangkit modern
IEEE C37
Standard untuk pengujian switchgear dan circuit breaker di sistem pembangkit
SPLN & PLN
Persyaratan teknis PLN untuk komisioning unit pembangkit sebelum sinkronisasi ke jaringan
FAT & SAT
Factory Acceptance Test dan Site Acceptance Test sesuai dokumen kontrak EPC
Siap Komisioning PLTU Anda?
PT Tridaya Elektra Mandiri berpengalaman di PLTU Suralaya 2x1000MW, PLTU Tanjung Jati, PLTGU Riau. Tim engineer kami siap mobilisasi ke seluruh Indonesia.
Email: marketing@tridayaelektramandiri.com | 24/7 Emergency Response
📋 Proyek dan Layanan Terkait PT TEM