Jasa Testing Commissioning PLTU, PLTGU & Pembangkit Listrik
Commissioning pembangkit baru atau overhaul: PLTU batubara, PLTGU gas, PLTD diesel, PLTMG. GI step-up 150kV, trafo unit, relay protection, sinkronisasi ke grid PLN.
Semua Layanan Tersedia
Tim bersertifikat, alat modern, koordinasi PLN P3B untuk sinkronisasi ke grid.
GI Step-Up 150kV Commissioning
FAT, SAT, relay protection, CB timing test, CT/PT test, energize. Koordinasi PLN UIP dan P3B untuk sinkronisasi ke jaringan 150kV.
Trafo Unit Testing
SFRA, Tan Delta, DGA, winding resistance, turns ratio. Baseline kondisi trafo sebelum unit masuk operasi komersial COD.
Relay Protection Generator
Differential, overcurrent, reverse power, loss of excitation. Koordinasi proteksi lengkap sesuai standar PLN P3B dan IEC 60255.
Load Bank Test Generator Diesel/Gas
Step load 25-50-75-100% rated capacity. Transient response, voltage regulation, frequency stability sebelum COD.
Sinkronisasi Grid PLN
Sync check relay, AVR tuning, governor test, reactive power control. Prosedur sesuai PLN UIP dan P3B. Koordinasi SPLN dan PJBL.
CBM Program Tahunan Pembangkit
SFRA, DGA, Tan Delta, thermografi rutin. Cegah unplanned outage yang biayanya ratusan juta per hari untuk IPP.
Dipercaya Klien Terkemuka
PLTU Bosowa Makassar
Captive power industri Sulawesi Selatan. Testing komisioning dan CBM rutin tahunan.
PLTU Asam-Asam Kalsel
PLTU batubara 65MW Kalimantan Selatan. Testing GI step-up 150kV dan relay protection.
PLTMG Luwuk Sulteng
Pembangkit gas 40MW Sulawesi Tengah. Commissioning relay protection dan grid sync.
Captive Power Pertambangan
Smelter nikel dan tambang batubara Kalimantan. Load bank test generator dan CBM.
Referensi Standar Commissioning
Standar internasional dan PLN yang digunakan dalam setiap pekerjaan commissioning pembangkit.
| Item Pekerjaan | Standar | Keterangan |
|---|---|---|
| GI Step-Up 150kV | IEC 62271 / PLN | FAT + SAT + relay protection + energize ke grid PLN |
| Trafo Unit | IEC 60076 | SFRA + Tan Delta + winding resistance + turns ratio |
| Generator Protection | IEC 60255 / PLN P3B | Differential + overcurrent + reverse power relay |
| Load Bank Test | IEC 60034 | Step load 25-50-75-100% rated capacity generator |
| Grid Sinkronisasi | PLN P3B | Sync check relay + AVR + governor test sebelum COD |
Pembangkit Anda Butuh Commissioning?
Tim PT TEM siap mobilisasi ke seluruh Indonesia. Pengalaman 100+ proyek PLN, IPP, dan captive power industri.
Jasa Testing Commissioning PLTU & PLTGU Indonesia
PT TEM memiliki pengalaman luas di commissioning PLTU (Pembangkit Listrik Tenaga Uap) dan PLTGU (Gas Uap) — dari unit 25 MW hingga 660 MW. Sesuai standar PLN, IEC, dan CIGRE.
Scope Commissioning PLTU:
- ✓ Generator stator/rotor insulation test
- ✓ Step-up transformer 150kV/500kV commissioning
- ✓ Switchgear 6kV/11kV/20kV testing
- ✓ Relay protection setting & testing (diferensial, distance)
- ✓ Motor MCC 6kV commissioning
- ✓ Load bank testing auxiliary transformer
PLTU yang Pernah Ditangani:
- ✓ PLTU Kaltim (Kariangau, Embalut)
- ✓ PLTU Dumai, Pekanbaru Riau
- ✓ PLTU Halmahera (smelter)
- ✓ PLTU Sulawesi (Bosowa, PLTMG)
- ✓ PLTGU Cilegon Banten
- ✓ PLTU Sumatra (Asam-Asam, Belawan)